PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Patching of Stair -2 (800x600).jpg Patching Stair -2 (800x600).jpg Roof perimeter without the steel plates to support the metal decking (800x600).jpg Started installing duct work at the 1st Floor Facing South-East (800x600).jpg Welded metal clips around the perimeter of the 4th Floor (North Elevation) (800x600).jpg
Previous page Welded metal clips around the perimeter of the 4th Floor (North Elevation) (800x600)
Welded metal clips around the perimeter of the 4th Floor (North Elevation) (800x600)